Skip to content

Office Fit-Out & Refurbishment Success: BSE UK Transforms Workspaces in Chepstow, Monmouthshire

IMG_8026

Location: Chepstow, Monmouthshire

Client Background: BSE UK was entrusted with the task of revitalizing an outdated office space in Chepstow, South Wales. The client sought a complete office refurbishment to create a contemporary and inviting environment for their employees following an office move.

Challenges: The existing office required a significant update to align with the client's vision of a modern, vibrant workspace. BSE UK embraced the challenge, aiming to provide a one-stop turnkey solution for the complete office refurbishment.

Scope of Works:

Strategic Demolition and Reconstruction:

  • Executed a thorough strip-out of existing offices and kitchenette, including partitions, ceilings, lighting, and electrics.
  • Infill existing doorways with new stud and plasterboard, tape, and joint.
  • Installed new FD30 paint-grade doors in newly formed openings.

Modern Office Spaces:

  • Introduced glass partitions to create functional and aesthetic meeting rooms.
  • Implemented new suspended ceilings across two floors for a uniform and contemporary look.

Aesthetic Enhancements:

  • Conducted full paint and decoration on both floors to create a clean and fresh aesthetic.
  • Installed a variety of floor coverings, including carpet and Luxury Vinyl Tile (LVT).

Functional Facilities:

  • Installed a new kitchenette featuring a boiler tap and microwave for enhanced employee convenience.
  • Provided and installed new office furniture, including desks, meeting room furniture, and break-out area furnishings.

Lighting and Electrical Upgrades:

  • Upgraded lighting to energy-efficient LED fixtures with lighting control and emergency lighting systems.
  • Installed new sockets and CAT5 cabling for enhanced connectivity.

Facility Amenities:

  • Upgraded sanitaryware and introduced hand dryers to enhance restroom facilities.
  • Installed an Electric Vehicle (EV) charger to support sustainable commuting.

Advanced Security Systems:

  • Implemented new fire and security alarm systems, CCTV, and access control for enhanced workplace security.

Project Management Excellence:

  • Provided end-to-end project management services, ensuring seamless coordination and timely completion of all tasks.

Results:

BSE UK successfully transformed the existing office space into a modern, functional, and aesthetically pleasing workplace. The comprehensive refurbishment not only met the client's expectations but also enhanced the overall work environment, fostering a positive and engaging atmosphere for employees.

Check out our project gallery below

Contact us

Bristol Storage Equipment Limited
Unit 2, Severnlink Distribution Centre,
Chepstow, NP16 6UN

Sign up to receive our newsletter

By submitting this form you agree to our privacy and data protection policy which governs how we deal with personal data.

Get in touch

    Scroll To Top